Study Spotter: Work Breakdown Structure

1.0 App Planning
1.1 Define project scope
1.1.1 Identify main purpose
1.1.2 Identify key features
1.1.3 Identify what programs will be used
2.0 Research
2.1 Analyze similar apps for improvements and things that are working
2.2 Create a list of basic requirements for the app
2.3 Analyze the target audience and how to cater to that group
3.0 Wireframe
3.1 Plan where certain features will go
3.2 Define what each app page will do and what content they’ll have
3.3 Describe why the app is an improvement from the website
4.0 Development
4.1 Implement ideas with foundation such as an app builder application with code
4.2 Adding interactive features that work seamlessly throughout the app
4.3 Create databases for certain features like the study spaces and review system
4.3.1 Create algorithm that suggests spaces based on user profile
5.0 Home Page
5.1 Create a homepage with clear directions on how to access each feature
5.2 Integrate FSU’s reservation system
5.3 UX Design on the features available
5.3.1 Design mockups
5.3.2 Create prototypes
6.0 Feature Implementation
6.1 User Profile
6.1.1 Create database for secure login information
6.1.2 Set up a window for users to login
6.1.3 Set up preferences and permissions for the app
6.2 Location Database
6.2.1 Gather location data
6.2.2 Create location profiles
6.3 Reservation System
6.3.1 Create a reservation window
6.3.2 Integrate calendar system
6.4 Rating and Review System
6.4.1 Develop a rating mechanism6.4.2 Implement review submission
7.0 Quality Assurance
7.1 Begin testing the app to ensure everything works
7.2 Fix any outstanding issues/bugs
7.3 Conduct multiple rounds of tests
7.3.1 T est functionality frontend and backend development
8.0 Publish or present app
8.1 Present finished product to shareholders (classmates and profes